No More Worries!


Our orders are delivered strictly on time without delay

Paper Formatting

  • Double or single-spaced
  • 1-inch margin
  • 12 Font Arial or Times New Roman
  • 300 words per page

No Lateness!

image Our orders are delivered strictly on time without delay

AEW Guarantees

image

  • Free Unlimited revisions
  • Guaranteed Privacy
  • Money Return guarantee
  • Plagiarism Free Writing

Work Breakdown Structure (WBS): A hierarchical decomposition of the total scope of work

Work Breakdown Structure (WBS): A hierarchical decomposition of the total scope of work to be carried out by the project team to accomplish the project objectives and create the required deliverables.According to the PMBOK® Guide, “The WBS organizes and defines the total scope of the project and represents the work specified in the current approved project scope statement. The planned work is contained within the lowest level of WBS components, which are called work packages. A work package can be used to group the activities where work is scheduled and estimated, monitored, and controlled. In the context of the WBS, work refers to work products or deliverables that are the result of activity and not to the activity itself.”Project Management Institute, A Guide to the Project Management Body of Knowledge, (PMBOK® Guide) – Sixth Edition, Project Management Institute Inc., 2017, Page 157.The WBS is used to create the project schedule based on the activities needed to complete the work of the project.Based on the selected project of interest create a WBS. Among other things, be sure to:

Identify and analyze the project deliverables
Develop the structure and organize the WBS
Decompose the upper WBS levels into detailed components
Determine identification codes for the WBS components

This question has been answered.

Get Answer
PLACE AN ORDER NOW

Compute Cost of Paper

Subject:
Type:
Pages/Words:
Single spaced
approx 275 words per page
Urgency:
Level:
Currency:
Total Cost:

Our Services

image

  • Research Paper Writing
  • Essay Writing
  • Dissertation Writing
  • Thesis Writing

Why Choose Us

image

  • Money Return guarantee
  • Guaranteed Privacy
  • Written by Professionals
  • Paper Written from Scratch
  • Timely Deliveries
  • Free Amendments