No More Worries!


Our orders are delivered strictly on time without delay

Paper Formatting

  • Double or single-spaced
  • 1-inch margin
  • 12 Font Arial or Times New Roman
  • 300 words per page

No Lateness!

image Our orders are delivered strictly on time without delay

AEW Guarantees

image

  • Free Unlimited revisions
  • Guaranteed Privacy
  • Money Return guarantee
  • Plagiarism Free Writing

Purchase a replacement numerically controlled (NC) plasma

 

The production manager has asked you to purchase a replacement numerically controlled (NC) plasma-cutting machine for the metal fabrication shop. She has provided you with the manufacturer’s number and model number for two models and indicates that the performance of either machine is perfectly acceptable. The existing tooling and fixtures will also work with either machine. Footprint and utility requirements are nearly the same as the old machine and will not require changes to the facility. The equipment will be depreciated over a ten-year period, which is also the expected service life. An annual service contract is required after the expiration of the warranty and throughout the remaining service life. You will take advantage of a 2% discount offered by each supplier for paying cash. You decide to complete a total cost of ownership (TCO) analysis to help make the purchasing decision.

This question has been answered.

Get Answer
PLACE AN ORDER NOW

Compute Cost of Paper

Subject:
Type:
Pages/Words:
Single spaced
approx 275 words per page
Urgency:
Level:
Currency:
Total Cost:

Our Services

image

  • Research Paper Writing
  • Essay Writing
  • Dissertation Writing
  • Thesis Writing

Why Choose Us

image

  • Money Return guarantee
  • Guaranteed Privacy
  • Written by Professionals
  • Paper Written from Scratch
  • Timely Deliveries
  • Free Amendments