No More Worries!


Our orders are delivered strictly on time without delay

Paper Formatting

  • Double or single-spaced
  • 1-inch margin
  • 12 Font Arial or Times New Roman
  • 300 words per page

No Lateness!

image Our orders are delivered strictly on time without delay

AEW Guarantees

image

  • Free Unlimited revisions
  • Guaranteed Privacy
  • Money Return guarantee
  • Plagiarism Free Writing

Earned Value Management

 

Focus your research and writing on a service type project with an international component.
Your assignment is as follows:
Imagine that you are writing a scholarly paper for consumption by a new undergraduate student in the project management program. In your paper, explain the following using examples related to a service project:
• Create WBS – including information on decomposition, and WBS to five levels as shown in the video example in Module 4.
• Activity list, attributes, and milestone list
• Precedence diagramming method (PDM), dependency determination, task duration, and leads and lags, and critical path method (CPM).
• Project schedule network diagram with critical path, ES, LS, EF, LF, and slack.
• Resource requirements – including resource calendar, resource breakdown structure, resource constraints, and resource leveling.
• Estimates of activity duration – including analogous estimating, parametric estimating, or three-point estimating, and reserve analysis.
• Human resource management – including responsibility chart matrix, RACI matrix, networking requirements, and pertinent organizational theory.
• Communications management – including communication requirements analysis, communication technology, communication models and methods.
Your well-written paper must meet the following requirements:
• 3-5 pages in length, not including cover, references page, nor appendices.
• Supporting documents must appear in appendices.
• The paper must be supported by at least 4 quality sources, of which 2 must be current, scholarly resources. For this assignment, current, scholarly sources are peer reviewed journal articles published within the most recent 3 years and accessed from the library databases or other academic sources. Textbooks will not count toward peer reviewed requirements but may be used as quality sources if published within the most recent 3 years. The use of the PMBOK ® Guide as a quality source is strongly suggested. The PMBOK ® Guide is not a scholarly resource.
• Formatted according to the CSU Global Writing Center Links to an external site..
• Be sure to properly organize your writing and include an introduction, headings / subheadings for the body of your work, analysis and recommendations, conclusion, and list of references. Review the grading rubric, which can be accessed from the Course Information page. Reach out to your instructor if you have any questions about the assignment.

ASSIGNMENT 2 – PP – MILESTONE

Building on your work in Module 1 and 2 Portfolio Project Milestones and with a specific focus on your service project at the company you selected, develop the following subsections of your project:

• Create WBS – including information on decomposition, and WBS to five levels as shown in the video example in Module 4.
• WBS Dictionary, Activity list, attributes, and milestone list.
• Precedence diagramming method (PDM), dependency determination, task duration, and leads and lags, and critical path method (CPM).
• Project schedule network diagram with critical path, ES, LS, EF, LF, and slack.
And optionally:
• Resource requirements – including resource calendar, resource breakdown structure, resource constraints, and resource leveling.
• Estimates of activity duration – including analogous estimating, parametric estimating, or three-point estimating, and reserve analysis.
• Human resource management – including responsibility chart matrix, RACI matrix, networking requirements, and pertinent organizational theory.
• Communications management – including communication requirements analysis, communication technology, communication models and methods.

Your well-written paper must meet the following requirements:

• 3-5 pages in length, not including cover, references page, and appendices. (With your prior work, this must bring you to 6 to 12 pages total.)
• Supporting documents must appear in appendices.
• The paper must be supported by at least 2 quality sources, of which 1 must be a current, scholarly resource. For this assignment, current, scholarly sources are peer reviewed journal articles published within the most recent 3 years and accessed from the library databases or other academic sources. Textbooks will not count toward peer reviewed requirements but may be used as quality sources if published within the most recent 3 years. The use of the PMBOK ® Guide as a quality source is strongly suggested. The PMBOK ® Guide is not a scholarly resource.
• Formatted according to the CSU Global Writing Center.
• Be sure to properly organize your writing and include an introduction, headings / subheadings for the body of your work, analysis and recommendations, conclusion, and list of references. Review the grading rubric, which can be accessed from the Course Information page. Reach out to your instructor if you have any questions about the assignment.

ASSIGNMENT 1 CT- WEEK 5

n this option, you will focus your research and writing on a service type project with an international component.
Your assignment is as follows:
Imagine that you are writing a scholarly paper for consumption by a new undergraduate student in the project management program. In your paper, explain the following:
• Rules for cost and performance management – including a discussion of earned value measurement (EVM) techniques.
• Earned Value Management – including three key dimensions for each work package.
• Schedule Forecasts – including purpose and measurement during monitoring and controlling.
• Cost estimates – including basis of estimates, vendor bid analysis, cost benefit analysis, and cost of quality.
• Budget – including cost baseline, management reserve, control accounts, contingency reserve, activity contingency reserve, and project funding requirements.
• Procurement – including bidder conferences, proposal evaluation, advertising, seller selection, and agreements.
Your well-written paper must meet the following requirements:
• 3-5 pages in length, not including cover, references page, and appendices.
• Supporting documents must appear in appendices.
• The paper must be supported by at least 4 quality sources, of which 2 must be current, scholarly resources. For this assignment, current, scholarly sources are peer reviewed journal articles published within the most recent 3 years and accessed from the library databases or other academic sources. Textbooks will not count toward peer-reviewed requirements but may be used as quality sources if published within the most recent 3 years. The use of the PMBOK ® Guide as a quality source is strongly suggested. The PMBOK ® Guide is not a scholarly resource.
• Formatted according to the CSU Global Writing Center Links to an external site..
• Be sure to properly organize your writing and include an introduction, headings / subheadings for the body of your work, analysis and recommendations, conclusion, and list of references. Review the grading rubric, which can be accessed from the Course Information page. Reach out to your instructor if you have any questions about the assignment.

Building on your work in Module 1, 2, and 4 Portfolio Project Milestones and with a specific focus on your service project at the company you selected, develop the following subsections of your project:
• Rules for cost and performance management – including a discussion of earned value measurement (EVM) techniques.
• Earned Value Management – including three key dimensions for each work package.
• Schedule Forecasts – including purpose and measurement during monitoring and controlling
• Cost estimates – including basis of estimates, vendor bid analysis, cost benefit analysis, and cost of quality.
• Budget – including cost baseline, management reserve, control accounts, contingency reserve, activity contingency reserve, and project funding requirements.
• Procurement – including bidder conferences, proposal evaluation, advertising, seller selection, and agreements.

 

This question has been answered.

Get Answer
PLACE AN ORDER NOW

Compute Cost of Paper

Subject:
Type:
Pages/Words:
Single spaced
approx 275 words per page
Urgency:
Level:
Currency:
Total Cost:

Our Services

image

  • Research Paper Writing
  • Essay Writing
  • Dissertation Writing
  • Thesis Writing

Why Choose Us

image

  • Money Return guarantee
  • Guaranteed Privacy
  • Written by Professionals
  • Paper Written from Scratch
  • Timely Deliveries
  • Free Amendments